Creates a graph that show the amount of sludge which will be produced as a function of Solids Retention Time. |
 |
asdfdsaf

USING:
Select the Basins for analysis, set the conditions, and click Plot.
FIELDS:
Minimum SRT(Days): Enter value to establish "x" axis origin of plot.
Maximum SRT(Days): Enter value to establish "x" axis end of plot.
Influent Flow(MGD): Enter the flow for this analysis
Influent Organic(mg/L): Enter value for this analysis.
Estimate Effluent Organic(mg/L): Estimate value for this analysis
Basin Temperature (Deg C): Enter desired temperature for the analysis. Default is 20 Deg C
BUTTONS:
 |
Selects highlighted Basin. |
 |
Selects all basins. |
 |
Un-selects highlighted basin. |
 |
Un-selects all basins. |
 |
Generates plot of Solids Production as a function of SRT.
|
 |
Returns to the main menu. |
EXAMPLES:
